| Utility Construction | |||||
|
| |
Plumbing | ||||
|
| |
| |
HVAC | |||
|
| |
| |
| |
Electric | ||
SUBDIVISIONS |
|
|
|
|
|
|
|
|
|
|
● |
Northmonte, 1988, incl. booster stations and storage tanks | √
|
|||
|
● |
Lovers’ Leap, 1994-1997, incl. booster stations and storage tanks | √ |
|||
|
● |
Cedar Creek, 1996-1998, incl. booster stations and storage tanks | √ |
|||
| |
|
|
|
|
|
|
|
||
| GOLF COURSES | |
|
|
|
|
|
|
|
|
|
● |
Mountain Pub-links; Pike County’s public course 1991 & 1995 | √ |
|||
|
● |
Raven Run; Jenkins, KY. irrigation contractor; 1994 | √ |
|||
|
● |
Widow’s Watch; 2000 and 2001; well pump installations | √ |
|||
| Utility Construction | |||||
|
| |
Plumbing | ||||
|
| |
| |
HVAC | |||
|
| |
| |
| |
Electric | ||
| WATER & WASTE WATER | |
|
|
|
|
|
|
|
|
|
● |
Sidney Coal; 1998; 20,000 gpd waster water treatment plant | √ |
|||
|
● |
Breaks Interstate Park; 1999; 60,000 gpd wwtp w/two plants, separate grinder, equalization chamber, uv chamber, post-aeration, auto recorder and sampler | √
|
|||
|
● |
Paintsville Utilities; 1999; new sludge press | √
|
|||
|
● |
Campton Water Plant; 1999; new raw water intake structures and pumps; upgrade low and high service pumps and controls;(alum floating intake structures fabricated in- house) | √
|
|||
|
● |
Beaver Elkhorn Water District: 2000; booster stations, storage tanks; road bores; rock excavation | √
|
|||
|
● |
Prestonsburg Utilities; 2000; lift station | √
|
|||
|
● |
Paintsville Lake State Park: 2001; new campground project; plumbing, HVAC, elec. & site util | √
|
√
|
√ |
√
|
|
● |
Pikeville Raw Water Intake; 2001; rehab/replace pumps and intake screens in river; grit cyclone seperator and building for same; #5 filter in plant w/controls; degrit pump; grit line w/road and railroad bores | √
|
|||
|
● |
Cross Creek Sewer Project: 2001; force main and three lift stations to serve the Paintsville Lake resort area as well as an exclusive subdivision | √
|
|||
|
● |
Microcomm: 2000 –2002; 60 + telemetry installations for water and wastewater app’s | √
|
|||
| Utility Construction | |||||
|
| |
Plumbing | ||||
|
| |
| |
HVAC | |||
|
| |
| |
| |
Electric | ||
| Mining Related | |
|
|
|
|
|
|
|
|
|
● |
McCoy Elkhorn Coal: 1999; Layne’s Branch groundwater remediation project, 700 gpm circulation and aeration using line shaft turbine pump w/sleeving for intake level determination, venturi induction air chambers, static mixers, positive discharge blowers | √ |
|||
|
● |
Other mine services 1998-present: pond pumping; pond and road construction; bentonite ponds; extensive drainage pumps and piping installations; slurry line construction; portable welding by certified people; concrete and masonry work for retaining walls, beltlines and equipment pads; sewage plants installation, rehab and pumping; slip repair/reclamation; extensive service trade work for water, plumbing, HVAC and electrical | √ |
√ |
√
|
√ |
|
● |
Knott Co. Coal: 2000; slurry line installation with 110’ bore on grade; 1,400’ welded steel 6” carrier line encased in 12’ welded line; 6,000’ + hdpe fused line; (around the hill, under the railroad and the main road; under the creek; up the hill to the impoundment; part of the line through solid rock) | √ |
|||
| Utility Construction | |||||
|
| |
Plumbing | ||||
|
| |
|
| HVAC | |||
|
| |
| |
| |
Electric | ||
| MEDICAL, INSTITUTIONAL COMMERCIAL & PRIVATE | |
|
|
|
|
|
|
|
|
|
● |
Belhasen Clinic: Paintsville, KY; 1999; water, sewer, plumbing, HVAC contracts for approx. 50,000 sq. ft. complex | √
|
√
|
√
|
|
|
● |
Pikeville Methodist Hospital: 1999; medical gas plumbing contractor for new addition | √ |
|||
|
● |
Jenny Wiley Lodge Renovation: 1997; water main relocation, gravity sewer w/lift station, plumbing contractor, heating and cooling contractor | √ |
√ |
||
|
● |
Buckhorn Lodge Renovation: 1998; plumbing contract | √ |
|||
|
● |
Carl Perkins Job Corps Center: 1998; extensive storm drainage incl. concrete flow channels through swamp | √ |
|||
|
● |
Presbyterian Church Complex: Pikeville, KY; 1998; plumbing and HVAC contract | √ |
√ |
||
|
● |
Morningside Assisted Living Facility: Pikeville, KY; 1999; electrical contract | √ |
|||
|
● |
Performing Arts Center: Morehead; plumbing; 2000 | √ |
|||
|
● |
Mountain Comprehensive Care Center: Whitesburg; plumbing and HVAC; 2000 | √ |
√ |
||
|
● |
Lawson Farm: Lexington, KY; pumps, controls and piping installation for 15 million gal. pond project with supplementary well, 300 gpm irrigation pumps, livestock troughs makeup water, 25 hp fountain; 2000 | √ |
|||
|
● |
Mount Sterling Airport: water line extension with horizontal boring; 2000 | √ |
|||
|
● |
Pine Acres Elementary: Ashland; 2000; plumbing contract | √ |
|||
|
● |
Anthony Hotel: Pikeville; 2000; plumbing contract | √ |
|||
|
● |
Worldwide Equipment: Prestonsburg; 2000; plumbing and HVAC contracts | √ |
√ |
||
|
● |
Triple J Farms: Lexington area; 2000; underground utilities | √ |
|||
|
● |
Red Fox Resort: Hindman; 2000; test well, pump install with custom pump screen | √ |
|||
|
● |
Church of God: Lexington; plumbing, HVAC and electrical; site work | √ |
√ |
√ |
|
|
● |
Eden Elementary: plumbing, HVAC and site utilities including waste water treatment plant, 4-lane road bore, 156 well field for geothermal HVAC system; Inez, KY. | ||||
|
● |
Challenger Center: Hazard community College; plumbing, HVAC and site utilities | √ |
√ |
||
|
● |
Corps of Engineers; Paintsville Lake State Park: lift station replacement | √ |
|||
|
● |
Hindman Sewer Project: rehab nine lift stations with new pumps, piping, telemetry | √ |
√ |
||
|
● |
Smitty’s Deli: Pikeville; plumbing and HVAC | √ |
√ |
||
|
● |
Elliott Co. Courthouse: plumbing and HVAC | √ |
√ |
||
|
● |
Aracoma Coal Co.: Logan, WV; booster station, waste water treatment plant, water treatment for bathhouse, line extensions | √ |
|||
|
● |
Community Trust Op Center: lift station; plumbing, electrical and HVAC contracts | √ |
√ |
√ |
√ |
|
● |
Hal Rogers Center: electrical contractor | √ |
|||
|
● |
Delbarton Mining: 100+ temporary storage and booster systems for private residences; utilize our tanker truck along with several one ton trucks to transport and fill the temp. systems | √ |
|||
|
● |
Perkins Job Corps: lift station replacement; Prestonsburg | √ |
|||
|
● |
Community Trust Bank: lift station elimination; gravity sewer installation to new main | √ |
|||
|
● |
Sandy Valley Water: several road bores | √ |
|||
|
● |
U. S. Filter: Whitesburg; several road bores | √ |
|||
|
● |
Maury Co. Public Utilities: Columbia, Tenn.; telemetry installations | √ |
|||
|
● |
Law Engineering: Lexington, KY; testing and evaluation of utilities and sub drainage for Wal-Mart, So. Williamson, KY | √ |
|||
|
● |
Hazard Community College: 700 Building Renovation ( General Contractor ) | √ |
√ |
||
|
● |
Johnson County Middle School, HVAC, Plumbing and Electrical renovations | √ |
√ |
√ |
|
|
● |
Paintsville High School: HVAC, Plumbing and Electrical renovations | √ |
√ |
√ |
|
|
● |
Waterfield Hall: Morehead State University (General Contractor) | √ |
|||
|
● |
Letcher Elementary School Renovations ( General Contractor ) | √ |
√ |
√ |
|